← ALL WORK
CASE 00 · HOUSE DESIGN

L-2401 “Panto” — from drawing to finished frame.

QTY 100 SAMPLE 12 DAYS PRODUCTION 38 DAYS AC-1041 CLASSIC TORTOISE
L-2401 Panto — finished frame, studio shot
01 / BRIEF

Prove the process on ourselves first.

Before asking any brand to trust us with their first run, we ran our own design through the exact pipeline we sell: a classic panto in 6mm classic tortoise, MOQ-sized batch of 100, every milestone photographed and timestamped. No cherry-picking — the timeline below is the real one.

02 / TECHNICAL DRAWING

Day 0 — the drawing you approve.

52 18 145 L-2401 · 52□18-145 · ACETATE 6MM REV B — APPROVED DAY 0 · BEVEL +0.4MM, BRIDGE KEYHOLE → SADDLE
03 / SAMPLE ITERATIONS

Day 12 — sample v1 vs v2.

Sample v1
V1 · DAY 12 — temple too thick at hinge, bridge sat high
Sample v2 — approved
V2 · DAY 19 — −0.8mm temple, saddle bridge. Approved.
04 / FINISHED FRAMES

Day 57 — 100 frames, QC'd and packed.

Finished batch, packed
05 / THE NUMBERS
12d First sample
2 Sample rounds
38d Production, 100 pcs
0 Units above AQL 2.5

“We published every step of this run — including the v1 sample we rejected. That's the standard your project gets.”

— LUCIDA, DUQIAO WORKSHOP

Ready to run yours?

Start your project →
WA